Please be advised that there has been a schedule change for the Railroad Crossing work.
Pan Am Railways will begin railroad grade crossing reconstruction in Falmouth this month. During the days listed the grade crossing will be closed to traffic for the majority of the day. We request that motorists seek alternate routes during these times.
Mon. 9/26 CUMBERLAND Rte 9 paving
Tues. 9/27 CUMBERLAND Tuttle Rd. paving
Wed. 9/28 FALMOUTH Falmouth Rd. track panel installation
Thu. 9/29 FALMOUTH Fields Rd. track panel installation
Fri. 9/30 CUMBERLAND Greeley Rd. paving
Mon. 10/3 FALMOUTH Woodville (aka Dunham) Rd. track panel installation
Wed. 10/5 FALMOUTH Falmouth Rd. paving
Thu. 10/6 FALMOUTH Fields Rd. paving
Fri. 10/7 FALMOUTH Woodville (aka Dunham) Rd. paving
Pan Am Railways will begin railroad grade crossing reconstruction in Falmouth this month. During the days listed the grade crossing will be closed to traffic for the majority of the day. We request that motorists seek alternate routes during these times.
Mon. 9/26 CUMBERLAND Rte 9 paving
Tues. 9/27 CUMBERLAND Tuttle Rd. paving
Wed. 9/28 FALMOUTH Falmouth Rd. track panel installation
Thu. 9/29 FALMOUTH Fields Rd. track panel installation
Fri. 9/30 CUMBERLAND Greeley Rd. paving
Mon. 10/3 FALMOUTH Woodville (aka Dunham) Rd. track panel installation
Wed. 10/5 FALMOUTH Falmouth Rd. paving
Thu. 10/6 FALMOUTH Fields Rd. paving
Fri. 10/7 FALMOUTH Woodville (aka Dunham) Rd. paving
No comments:
Post a Comment